Other information:
System Operation
System Diagram
Item
Description
1
Air Cleaner (ACL) outlet pipe
2
EVAP ejector
3
Turbocharger to CAC tube
4
Check valve
5
EVAP purge valve
6
Check valve
7
Intake manifold
8
Fuel tank filler pipe
9
EVAP canister
10
Fuel vapor vent valve
11
Fue..
Removal
NOTE:
Removal steps in this procedure may contain installation details.
NOTE:
The EBB and the ABS module are serviced as an assembly and should not be separated.
NOTE:
The PMI process must begin with the current ABS module installed. If
the current ABS module does not respond to the diagnostic scan tool, the
tool may prompt for As-Built Data as part of the repair.
..